The Skilled Labor Shortage #2
Smart Bothell Refresh
This Seattle area townhouse may have been able to catch the attention of buyers, but the interior would struggle to keep them interested. Curbio focused on some small but impactful updates.
Although this Bothell townhouse had a plethora of community amenities to get potential buyers through the door, the interior of the home didn’t live up to the hype. Curbio focused on smart updates to help the home reach its full potential.
This Seattle area refresh included work such as:
- Flooring updates
- Interior painting
- Bathroom upgrades
- Kitchen touch-ups
Thanks to these updates and the work of listing agent Tammy Hatch from HomeSmart, the home sold after just one day on the market. Not only was the seller happy about the boost, but also the real estate agent was once again pleased. Tammy exclaimed, “I have used Curbio several times and have always done well in getting the price our clients wanted.”
We want to help. Contact us to learn more about partnering with us or get a free home improvement estimate to get started.
Originally, the kitchen lacked a few key details to make it a modern space that every home cook would love. Once complete, the kitchen was able to make a memorable first impression.
Our work included:
- Installing luxury vinyl tile (LVT) flooring
- Upgrading to a new quartz countertop
- Adding backsplash
- Installing an island/snack bar overhang with quartz countertops
- Adding a stainless steel sink and new faucet
- Installing a garbage disposal
- Replacing damaged cabinet doors and hardware
- Painting the walls and ceiling
Originally, the kitchen lacked a few key details to make it a modern space that every home cook would love. Once complete, the kitchen was able to make a memorable first impression.
Our work included:
- Installing luxury vinyl tile (LVT) flooring
- Upgrading to a new quartz countertop
- Adding backsplash
- Installing an island/snack bar overhang with quartz countertops
- Adding a stainless steel sink and new faucet
- Installing a garbage disposal
- Replacing damaged cabinet doors and hardware
- Painting the walls and ceiling
The bathroom was in good condition to begin with, but we made a few basic touch-ups to bring the room to the next level.
Our work included:
- Adding a granite vanity top with a new sink and faucet
- Updating the light fixture
- Replacing the toilet
- Caulking the bathtub
- Painting the walls and ceilings
- Replacing the exhaust fan/light combo motor & cover
- Adding a new bathroom accessory kit
- Installing luxury vinyl tile (LVT) flooring and shoe molding
The bathroom was in good condition to begin with, but we made a few basic touch-ups to bring the room to the next level.
Our work included:
- Adding a granite vanity top with a new sink and faucet
- Updating the light fixture
- Replacing the toilet
- Caulking the bathtub
- Painting the walls and ceilings
- Replacing the exhaust fan/light combo motor & cover
- Adding a new bathroom accessory kit
- Installing luxury vinyl tile (LVT) flooring and shoe molding
The master bathroom was a bit cluttered and had a few dated features that were bringing down its overall appearance. A few choice updates made the bathroom a bright spot in the home.
Project work in the bathroom included:
- Replacing the granite vanity top with two new sinks and faucets
- Updating the light fixtures
- Re-grouting and caulking the shower
- Replacing the toilet
- Adding a new bathroom accessory kit
- Painting the walls and ceilings
The master bathroom was a bit cluttered and had a few dated features that were bringing down its overall appearance. A few choice updates made the bathroom a bright spot in the home.
Project work in the bathroom included:
- Replacing the granite vanity top with two new sinks and faucets
- Updating the light fixtures
- Re-grouting and caulking the shower
- Replacing the toilet
- Adding a new bathroom accessory kit
- Painting the walls and ceilings
The bedrooms needed a few basic updates to help make the upstairs market ready.
Our work on the bedrooms included:
- Removing the old carpet and installing new padding and carpeting
- Fixing hairline cracks and small holes in the wall
- Painting the walls and ceilings
- Dusting, vacuuming, and a general cleaning
The bedrooms needed a few basic updates to help make the upstairs market ready.
Our work on the bedrooms included:
- Removing the old carpet and installing new padding and carpeting
- Fixing hairline cracks and small holes in the wall
- Painting the walls and ceilings
- Dusting, vacuuming, and a general cleaning